Two buildings, four years apart, for the same client — Nexzen

600.Nexzen · Pharmaceutical production and R&D campus · Pegões, Montijo · 2023-09

The project

A research building and then a production plant for plant-derived active substances for medicinal use, on one estate at Pegões. Architecture, fifteen engineering disciplines and both construction contracts were ours. Photographed from the air one hundred and sixteen times between the empty field and the finished campus.

What we were responsible for

Two buildings on one estate, commissioned separately and four years apart: first the research building, then the production plant. What they make is plant-derived active substances for medicinal use, and that single fact writes most of the brief — the process needs classified rooms, one-way flows for people and materials that never cross, air handling that holds pressure differences between rooms, and a security and traceability layer that a warehouse of the same volume would not have. A building of this kind is an envelope wrapped around a set of rules, and the rules come from the licence rather than from the architect. Ours was the architecture, fifteen engineering disciplines drawn in house — thermal, acoustic, fire safety, water and drainage, HVAC, structure, urban water, gas, integrated security, building management, electrical, telecoms and the carbon calculation among them — and both construction contracts. The white volumes are precast concrete; the vertical timber at the entrance is the one place where the building stops being industrial, and it is there because that is where people arrive. The price agreed at the outset was the price at the end. This work crossed the 2021–2022 materials market and the figure did not move — not because the market was kind, but because a price we have given is a commitment, and we hold it.

Who built it

WALLNUT was responsible for both the design and the construction, under a single contract: one team answered for the drawings, the site and the handover.

What this does not include

The process equipment, the licensing of the operation itself and everything that happens inside the classified rooms are the client’s: we built the envelope and the systems that serve it, not the process. The land was already the client’s. No cost, price or margin figure appears here: those are confidential. Six of the eight images are aerial photographs taken by us during the works, dated by flight; two are renders of the design, and they are ours — drawn in house, not received.

Verified facts

  • Commissions from this client
    2 the research building and the production plant, four years apart
  • Engineering disciplines drawn in house
    15 from thermal and acoustic to building management and the carbon calculation
  • Drone flights over the works
    116 between February 2021 and September 2023
  • Aerial photographs in our record
    30242 the most complete construction record we hold
  • What we answered for
    3 architecture, engineering and construction, under our own contracts
  • Price agreed at the outset
    1 held to the end, through the 2021–2022 materials market

Images

An aerial view of open farmland with an orchard on one side, a track and two small farm buildings, and no construction anywhere.
February 2021. The whole estate before anything: a field, a track and two farm buildings.
An aerial view of a single concrete building shell with its roof slab poured, standing alone on a cleared platform with plant and materials around it.
May 2021, the first commission. The research building, roof slab poured — the smaller of the two, and the one that came first.
An aerial view showing a completed white building with rooftop solar panels beside a grid of freshly cast pad foundations laid out across a cleared platform.
June 2022, and both commissions in one frame: the research building finished and generating on its own roof, and the pad foundations of the production plant set out beside it.
A near-vertical aerial view of a large roof slab under construction, reinforcement laid out across it and services set into it before the pour.
August 2022. Everything that will be buried in the slab goes in before it: on a building with classified rooms, a duct forgotten here is a wall opened later.
An aerial view of a long white production building with a metal roof, complete, with a second smaller building beside it and foundations still being worked in the foreground.
March 2023. The production plant closed in, with the research building beside it. Two contracts, one estate, one team on both.
An aerial view of the finished campus: white buildings, a fenced and surfaced yard with plant and equipment, and open country beyond.
September 2023, the last flight of one hundred and sixteen. Two and a half years from the field in the first photograph.
A render of the entrance: a white precast volume with a run of vertical timber fins over the doorway, two figures in conversation on the forecourt.
The entrance, as drawn. The timber fins are the only warm material on the building and they are placed exactly where people arrive, which is the whole argument for them.
An aerial render of the campus in its landscape: white volumes and a surfaced yard set in green fields and tree lines.
The campus as drawn, in the landscape it sits in. Compare it with the last photograph: the same footprint, four years later.

More of our work

Every project here is written up the same way: what we were responsible for, what we were not, and the measurements behind both.

Have a building to fit out?